My Bad

blowe's picture
Offline
Administrator
Joined: 10/09/2007
Juice: 82
My Bad

Sorry. I talked to Lyle and Andy about it and they felt like that was a good time-frame to try to get out RC1. I should have sent you a message first to see how it fits your schedule. I just kind of assumed they had a good handle on the status of the code for 3.0. Do you think September is doable for you? Lyle's impression was that Beta 3 was pretty close so it would not be too difficult to take it to RC.

Brian Lowe

Ubercart 3.0 Beta 3 for Drupal 7 By: blowe (6 replies) Tue, 07/19/2011 - 15:04